WebStructural

Drainage Designer

See where the rain on a site goes, early in design and before the drainage report. The designer follows the water downhill over the lidar, plays a design storm over the site, and works out the peak flows leaving it before and after building. New roofs and paving shed more rain, and faster, so most towns require the extra water to be held back until the peak flow leaving the site is no more than it was before. Size a pipe where the water leaves, or a detention pond that holds it back.

  1. Outline the site. The designer follows the rain downhill over United States Geological Survey (USGS) lidar: where it runs across the site, where it leaves, and the land above that drains onto it. Press Play to watch a storm.
  2. It finds the buildings and paving on the site now, which set the runoff before building.
  3. Say how much of the site will be roofs and paving. The designer works out the peak flows at each place the water leaves, before and after building.
  4. Size a pipe where the water leaves, or draw a pond there to check that it holds enough and to size its outlet.

Find the site, then press Outline the site and click its corners. Click the first corner again to close it. Drag the corners to change it.

Buildings: © OpenStreetMap contributors, Overture Maps Foundation (Open Database License).

Find the site

Outline the site

The land being built on. The designer follows the rain downhill over the lidar: where it runs across the site, where it leaves, and the land above that drains onto it. The site and that land are colored by their height.

What’s there now

Outline the site to see the buildings and paving on it now.

What you’ll build

The rest of the site is lawn in good condition. Paving is taken as draining straight to the outlet.

Soils and storms

Hold the water back optional

A pipe where the water leaves, sized for the storm’s peak flow after building, with the volume a pond or tank would need to hold back.

The slope starts at the ground’s fall below the place, at least 0.5%.

How the designer works

The ground comes from the USGS 3D Elevation Program’s 1 m lidar. Water is traced downhill cell by cell. Where the site’s water crosses its edge are the places it leaves, and the land outside the site whose water runs onto it drains with the place where that water leaves. Each place’s longest flow path gives its time of concentration, by the TR-55 sheet flow and shallow concentrated flow equations. The storm player sheds drops from each cell as its rain turns to runoff by the curve number equation, and moves them at the TR-55 shallow concentrated flow velocity for the cell’s slope.

Curve numbers come from the USGS National Land Cover Database and the hydrologic soil groups in the USDA soil survey, with the values in TR-55 table 2-2. Developed land is counted as lawn with the middle of its class’s share of paving. Natural cover is counted in good condition, which gives the largest pond. On the site, the roofs before building come from the Overture Maps building footprints (OpenStreetMap, Microsoft and Google). Each roof counts as paved, and the land cover’s paving share is reduced by the roofs it already includes, so no roof is counted twice.

Each storm is built from the site’s own NOAA Atlas 14 rainfall, 5 minutes to 24 hours, by the method in the NRCS National Engineering Handbook, chapter 4. Runoff is routed with the NRCS unit hydrograph, and the storage is the TR-55 chapter 6 estimate. The pond is graded into the lidar from the outline you draw, and its storage at each depth is the water over the graded ground. Anyone can see where the water goes, the land cover, soils and curve numbers, and play the storm; the storms’ numbers, storage, pipe and pond are part of Pro. The numbers are for planning and early pricing, not a drainage report: the city or county’s own methods, storms and release rates govern. The detention pond tutorial works the same steps by hand.