How to Size a Detention Pond
Building on a site replaces grass and woods with roofs and paving. More of the rain runs off, and it runs off faster, so the peak flow leaving the site goes up. A detention pond holds the extra water and lets it out slowly through a small outlet, so the peak leaving the site after it's built is no higher than it was before.
Sizing one comes down to four questions: how much runs off before and after, how high the peaks are, how much the pond has to hold to bring the peak back down, and what shape of pond holds that much. This tutorial works through each with the methods in the Natural Resources Conservation Service's TR-55 (Urban Hydrology for Small Watersheds), with a worked example you can check by hand.
Detention and retention
A detention pond (a dry pond) is empty between storms. It fills during a storm and drains through its outlet within a day or two. A retention pond (a wet pond) keeps a permanent pool and holds the storm water above it. Both control the peak the same way. This tutorial sizes the storage above the outlet, which is the same for either.
Step 1: runoff before and after
TR-55 works out runoff with a curve number (CN), a number from 30 to 98 for how much of the rain a surface sheds. It depends on the cover (woods, grass, paving) and the soil's hydrologic group, from A (sand, which soaks rain up fast) to D (clay, which barely soaks any up). The runoff depth is:
Q = (P − 0.2S)² / (P + 0.8S) with S = 1000 / CN − 10
where P is the storm's rainfall and Q the runoff, both in inches, and S is how much the ground can hold. The first 0.2S of rain soaks in before anything runs off. Where part of the site is paved, the paving is taken at CN 98 and the rest at its own number, weighted by area.
Worked example
A 10 acre meadow on group C soil is being developed, with 65% of it roofs and paving and the rest lawn in good condition. The 10-year, 24-hour rainfall from NOAA Atlas 14 is 4.5 in, and the storm is TR-55 type II. The time of concentration (the time water takes to reach the outlet from the farthest point) is 0.6 hr before and 0.2 hr after, since pipes and paving carry water faster than grass.
| Before | After | |
|---|---|---|
| Curve number (TR-55 table 2-2) | 71 (meadow, C) | 0.35 × 74 + 0.65 × 98 = 90 |
| S = 1000 / CN − 10 | 4.08 in | 1.11 in |
| Initial loss 0.2S | 0.82 in | 0.22 in |
| Runoff Q | (4.5 − 0.82)² / (4.5 + 3.27) = 1.75 in | (4.5 − 0.22)² / (4.5 + 0.89) = 3.40 in |
Almost twice as much water runs off after building. Over 10 acres, 3.40 in of runoff is 3.40 / 12 × 10 = 2.83 acre-feet, or about 123,000 cubic feet.
Step 2: the peak flows
TR-55's graphical method (chapter 4) gives the peak flow in cubic feet per second (cfs):
qp = qu × Am × Q
where Am is the drainage area in square miles (10 acres is 10 / 640 = 0.0156 sq mi), Q the runoff in inches, and qu the unit peak discharge from TR-55's exhibit 4, read from the time of concentration and the ratio of the initial loss to the rainfall, 0.2S / P.
| Before | After | |
|---|---|---|
| 0.2S / P | 0.82 / 4.5 = 0.18 | 0.22 / 4.5 = 0.05, so 0.10, the chart's lowest |
| Unit peak qu (type II) | 446 cfs per sq mi per in at 0.6 hr | 800 at 0.2 hr |
| Peak qp | 446 × 0.0156 × 1.75 = 12.2 cfs | 800 × 0.0156 × 3.40 = 42.4 cfs |
The peak goes up three and a half times: more runoff, and it arrives faster. Most cities and counties require the peak after building to be no more than the peak before, for each design storm. Some set a lower release rate, so check the local manual first.
Step 3: the storage
TR-55 chapter 6 gives a quick estimate of the storage needed. Take the ratio of the peak allowed out to the peak coming in, qo / qi, and read the storage as a share of the runoff volume, Vs / Vr, from its figure 6-1. For storm types II and III the curve is:
Vs / Vr = 0.682 − 1.43 r + 1.64 r² − 0.804 r³ with r = qo / qi
In the example:
| r = qo / qi | 12.2 / 42.4 = 0.287 |
| Vs / Vr | 0.682 − 0.410 + 0.135 − 0.019 = 0.388 |
| Runoff volume Vr | 2.83 acre-ft |
| Storage Vs | 0.388 × 2.83 = 1.10 acre-ft = 47,800 cu ft |
The pond holds back about 39% of the 10-year runoff. The figure is only drawn for ratios from 0.1 to 0.8, so outside that range the estimate doesn't apply. Repeat for each design storm, often the 2, 10, 25 and 100-year, and the largest storage sets the pond. TR-55 says the estimate can be off by up to about 25%, so it's for sizing a first try. Routing each storm through the pond and its outlet checks it.
Step 4: a pond that holds it
A pond's storage at each water depth is its stage-storage table. For a pond with sloped sides, add up the volume between each pair of depths by the average end area method: the average of the water areas at the two depths times the height between them.
ΔV = (A1 + A2) / 2 × Δh
Try a square pond with an 84 ft square flat bottom and 3:1 side slopes (3 ft across for every 1 ft up), the usual steepest for mowing and for getting out of the pond. Each foot of depth adds 6 ft to the width of the water.
| Depth | Water width | Area | Storage |
|---|---|---|---|
| 0 ft | 84 ft | 7,056 sq ft | 0 |
| 1 ft | 90 ft | 8,100 sq ft | 7,578 cu ft |
| 2 ft | 96 ft | 9,216 sq ft | 16,236 cu ft |
| 3 ft | 102 ft | 10,404 sq ft | 26,046 cu ft |
| 4 ft | 108 ft | 11,664 sq ft | 37,080 cu ft |
| 5 ft | 114 ft | 12,996 sq ft | 49,410 cu ft |
At 5 ft deep it holds 49,410 cu ft, more than the 47,800 needed. The 10-year storm fills it to 4 + (47,800 − 37,080) / 12,330 = 4.87 ft. Add 1 ft of freeboard above the highest water, so the top of bank is 6 ft above the bottom and 120 ft square, about a third of an acre. Dug into flat ground, that's 6 / 3 × (7,056 + 14,400 + √(7,056 × 14,400)) = 63,072 cu ft, or 2,336 cubic yards.
On sloping ground the pond is usually dug into the high side and closed with an embankment on the low side, which saves digging. Raising the top of bank trades digging for embankment fill, and one height balances the two.
Step 5: a first try at the outlet
An orifice (a round hole or pipe at the bottom of the pond) lets out:
Q = C × A × √(2 g h)
where C is about 0.6 for a sharp-edged opening, A is the opening's area in square feet, g is 32.2 ft/s² and h is the water's height above the center of the opening. For the 10-year storm, the outlet should let out no more than 12.2 cfs with the water at 4.87 ft. A 15 in pipe has an area of 1.23 sq ft and its center is 0.63 ft up, so h = 4.87 − 0.63 = 4.24 ft:
Q = 0.6 × 1.23 × √(2 × 32.2 × 4.24) = 12.2 cfs
That works for the 10-year storm, but one opening can't control every storm. The 2-year storm (3.0 in of rain) peaks at 4.8 cfs before building and needs about 33,100 cu ft of storage, which fills the pond to about 3.6 ft. At that depth the 15 in pipe lets out about 10 cfs, twice the 4.8 cfs before peak. So outlets are usually stacked in a riser: a small orifice at the bottom for the 2-year storm, a larger orifice or a weir above it for the 10 and 25-year storms, and an emergency spillway over the embankment for the 100-year storm. Each storm is then routed through the pond and its outlet to check the peaks, which is what drainage software does.
Sizing a pond from lidar
The detention pond calculator does the first four steps on the ground itself, for any site in the US:
- Find the site on the map and outline it. The page reads the US Geological Survey's 1 m lidar around it and traces water downhill to find everything that drains through the site's low point, including land upstream of the site. The longest path to the outlet gives the time of concentration.
- Curve numbers come from the National Land Cover Database and the hydrologic soil groups in the USDA soil survey. Set the share of the site that will be roofs and paving.
- Each storm is built from the site's own NOAA Atlas 14 rainfall and run through the NRCS unit hydrograph, which gives the peaks before and after and the TR-55 chapter 6 storage for the 2, 10, 25 and 100-year storms.
- Draw the pond at the outlet and set its top of bank, depth, side slopes and freeboard. The page grades it into the lidar, builds an embankment where the ground is low, and gives the stage-storage table, the digging and fill, and whether it holds each storm. A 3D model shows the pond in the ground.
The drainage area, land cover, soil groups and curve numbers are free. The storms, the storage and the pond are part of Pro. The numbers are for planning and early pricing, not a drainage report: the city or county's own methods, storms and release rates govern, and the outlet still has to be designed and routed.
Frequently asked questions
How big does a detention pond need to be?
It depends on the rainfall, the soil, what's built and the local release rate, so work it out for the site. In the worked example above, 10 acres going from meadow to 65% paving needs 1.10 acre-feet for the 10-year storm, about 0.11 acre-feet per acre, and the pond's top of bank covers about 3% of the site before its embankment.
What is freeboard?
The height from the highest design water level to the top of the bank or embankment. One foot is common. It leaves room for waves, settlement and storms larger than the design storm.
Why doesn't the storage estimate work for some storms?
TR-55's figure 6-1 only runs from qo / qi of 0.1 to 0.8. When building barely changes the peak, for example on a small site in a large drainage area, the ratio is above 0.8 and little or no storage is needed. Routing the storm through the pond gives the answer there.
How steep can the sides of a detention pond be?
3:1 is the usual steepest for slopes that are mowed and that people can walk out of. Some places allow 2:1 inside a fence, and many ask for 4:1. The outside of an embankment is often 3:1 as well.
What's the difference between the rational method and TR-55?
The rational method, Q = C i A, gives only a peak flow, from a runoff coefficient, a rainfall intensity and the area. It's common for small sites in city manuals. TR-55 gives the runoff volume as well as the peak, which a pond needs. Many manuals accept either for small sites, so use the one the local manual asks for.